Category: Case Studies
-

Remoulins University College, France
Background The new, architecturally designed, College Remoulin in France was completed in Jan 2022, opening its doors to welcome 720 new students. With an overall area of 5580m2, it is an expansive campus, comprising several buildings, including a reception area, administrative premises, a staff room, an infirmary, a kitchen, a large canteen and 2000m2 of classrooms.…
-

Elevator, UNYC, France
Background UNYC is a telecommunications company that specialises in digital communication technologies for businesses. It moved its head office to a new premises in the centre of Le Mans, France – a modern new build with 6 floors. However, it found that although located only 250mt from all the operators, there was no mobile signal…
-

Boost mobile signal in an elevator (delete)
Read time : 2 mins UNYC is a telecommunications company that specialises in digital communication technologies for businesses. It moved its head office to a new premises in the centre of Le Mans, France – a modern new build with 6 floors. However, it found that although located only 250mt from all the operators, there…
-

JCB Offices
Background Joseph Cyril Bamford Excavators Ltd. was founded by Joseph Cyril Bamford in October 1945 in England. In 1948, six people were working for the company, and it made the first hydraulic tipping trailer in Europe. By 1964, JCB had sold over 3,000 3C backhoe loaders. Today, they have 22 plants on four continents and…
-

Airport Carpark, France
Background The airport at Bale Mulhouse is an international airport in the Alsace region of France. Bordering three countries, France, Switzerland and Germany, it is a busy international airport with low-cost airlines as well as long distance, intercontinental flights. Passengers from all over the world pass through the airport with record numbers of 9 million…
-

Cavan General Hospital, Ireland
Background Installed Equipment: 14x StellaOffice 5 band repeaters. Building type: Multi Storey Hospital Location: Cavan, Ireland, Semi rural. Installation Company: SigmaWireless Cavan Hospital is a 40 year old building covering 30,000m2, with 264 beds. The wards are located over 3 levels, with one level below ground, and it also houses a canteen, a shop and many operating theatres…
-

All Together Now Festival, Ireland
Background “All Together Now” is an outdoor music festival with about 30,000 attendees, hosting great acts such as Underworld and Nick Cave and The Bad Seeds. The concerts passed with great success with a little help from Stella Doradus and the iRepeater. The challenge Mobile services are critical in these festivals, not only for entertainment, health…
-

Shopping Centre, Spain
Background Gran Jonquera is an outlet and shopping mall, located in La Jonquera in the Catalan Pyrenees in north eastern Spain. The shopping centre is a 12,000 m2 facility with a mixture of retail and restaurants. The Challenge The outlet is located in the Pyrenees in Spain. This is a notoriously hilly area, famous for…
-

Golf Clubhouse, Austria
Background This golf club, located in Bauvorhaben is a large modern clubhouse on a popular, scenic golf course. The course hosted a 5-storey newly renovated building that required a reliable system to provide signal to the entirety of the building. The challenge Visitors to the course expected to be able to make phone calls and…
-

Cayo Factory, Spain
Background Cayo is a meat processing facility in Ledrada, a small village in the Salamanca region of Spain. The province of Salamanca is famous for its Iberian cured ham, where the world famous Guijuelo Ham is produced. The facility is a large, five story building. Inside, hams are hung, cured and aged in a controlled,…





